第二个A & A Project: 给咖啡厅加盖户外硬顶凉棚和内部装修

来源: insight777 2012-09-17 10:25:04 [] [博客] [旧帖] [给我悄悄话] 本文已被阅读: 次 (11897 bytes)
本文内容已被 [ insight777 ] 在 2012-09-17 10:39:02 编辑过。如有问题,请报告版主或论坛管理删除.

Erection of  a Hard Roof  for Outdoor Refreshment Area (ORA) and Interior Decoration for Coffee Shop

1. In the Beginning

A. 
2. Preliminary Works

a. To engage Professional Engineer (PE) to submit and endorse drawings to the followings for Outdoor Refreshment Area (ORA):

1. Building Control Authority (BCA) 

2. Fire Safety Shelter Department (FSSD)

3. Housing Development Board (HDB)

4. National Environment Agency (NEA)

b. To design,calculate and endorse on Re-enforced Concrete (RC) stumps/footings to hold Newly Proposed Metal Roof

c. To design,calculate and endorse on Main Structural framing elements of Roof

d. To purchase plans from Relevant Plans from BCA and FSSD for submission purpose

3. Demonlition Works

3.1 To dismantle Existing Canopy and Footings

3.2 To hack off Existing Poles and Lights

3.3 To excavate and cave out roots for New RC Footings

3.4 To remove Existing Gutter and rainwater downpipes (RWDPs)

4. Masonry Works

4.1 To cast RC Footings (RC Stumps) to receive new timber support

4.2 To supply waterproofing membrane

4.3 To make good peripheral of RC Footings with Heavy Duty Ceramic Tiles

4.4 To erect Metal Posts to support Metal roofing (8)

5. Roofing Works

5.1 To erect Main Framing to support roof using 6-8mm thick Galvanized MS hollow sections

5.2 To erect Proposed New Roof using Kalzip profiled Metal roofing with C-Channels and Purlins, Angle Plates, BRC Meshes and Insulations

5.3 To cast New gutter and Aluminum Flashing with RWDPs 

6. False Ceiling Works

6.1 To erect false ceiling panel using Calcium Silicate Boards
6.2 To paint the ceiling

7. Electrical Works

7.1To  install electricity wiring and board
7.2 To install Fans and lights
7.3 To install sign boards for all stalls and whole coffee shop

8. Miscellaneous Works

8.1To clear debris after works

8.2To erect hoarding Works

8.3 To install kitchen tables and gas stoves and ventilation system
8.4 To make deposit to management

  9. Grand Total (after discount) = $58,000 

10. Completion and in Operation

请阅读更多我的博客文章>>>
  • 70 Burghley Dr, Serangoon Garden Estate (D19), S559035
  • 15-09-2012: Ho Bee seeing strong interest in Metropolis
  • Shophouse Series in Geylang
  • ZT身邊的窮人、富人
  • 10-09-2012: Investors zoom in on Dakota area
  • 所有跟帖: 

    very nice... -jy101- 给 jy101 发送悄悄话 jy101 的博客首页 (0 bytes) () 09/17/2012 postreply 10:39:28

    是在新加坡吗? -akebono- 给 akebono 发送悄悄话 akebono 的博客首页 (0 bytes) () 09/17/2012 postreply 10:39:41

    请您先登陆,再发跟帖!

    发现Adblock插件

    如要继续浏览
    请支持本站 请务必在本站关闭/移除任何Adblock

    关闭Adblock后 请点击

    请参考如何关闭Adblock/Adblock plus

    安装Adblock plus用户请点击浏览器图标
    选择“Disable on www.wenxuecity.com”

    安装Adblock用户请点击图标
    选择“don't run on pages on this domain”